Portfolio
Rancho Vistoso
The WLB Group has been providing services for the 7,500 acre Rancho Vistoso since 1985. Initial work included planning, zoning, utility master planning, as well as civil design, survey, and landscape design and construction…
Good Spring Trail
The WLB Group designed a trailhead and 2.3-mile long trail that provides unique opportunities for visitors to explore Nevada’s history and natural landscape. The project includes multiple accessible loop trails, interpretive exhibits, and numerous…
Harmon Interchange
The WLB Group was retained by Clark County, Nevada to provide construction management and contract administration for the Harmon Interchange project. The project included roadway improvements, bridges, UPRR grade separation, and related appurtenances along…
Himmel Park Playground
Working closely with the Sam Hughes Historic Society, The WLB Group paid careful attention to the details, materials and colors of this venerable university area facility. Working through an “Open End” contract with the…
NAU Honors College Housing
The project consisted of a 4 story structure with approximately 600 beds to be used as student housing and 25,000 sf of academic and retail space. The proposed building site contained a multitude of…
NAU Pedway
NAU sits at the base of the San Francisco Peaks with a 7000-foot elevation and four-season climate, surrounded by the largest contiguous pine forest in the world. The campus developed incrementally, resulting in some…
Get In Touch With Us
We are always eager to tackle new challenges and constantly seeking new team members who are ready to pursue these opportunities. If you are interested in the type of work we do and want to learn more about our current career openings, contact us today.